Home / Results / Deliverables · Deliverables Please note the CREMLINplus statements (homepage and here) on the Russian war against Ukraine. WP1 Results Deliverable D1.2 "Kick-off workshops for WP2-WP7" (3.1 MB) Deliverable D1.4 "Data Management Plan" (159KB) Deliverable D1.5 "Annual Meeting 2021" (3.7 MB) WP2 Results Deliverable D2.7 "Design of beam monitors, target chambers, beam pipes" (2.2 MB) Deliverable D2.1 "STS components assembled" (3.7 MB) Deliverable D2.5 "Simulation results for selected observables" (4.0 MB) WP3 Results Deliverable D3.1 "Definition of the optimal suite of instruments" (971KB) WP4 Results Deliverable D4.3 "Workshop on the integration of the USSR into the European community of advanced light sources" (918KB) WP5 Results Deliverable D5.1 "Status report on the software for the SCT detector" (540KB) Deliverable D5.2 "Status report on R&D work on inner tracker for the SCT detector" (3.3 MB) Deliverable D5.3 "Status report on R&D work on central tracker for the SCT detector" (4.7 MB) Deliverable D5.4 "Status report on R&D work on particle identification system for the SCT detector" (4.3 MB) WP6 Results Deliverabele D6.2 "Prototype of pulse compressor based on self-phase modulation" (1.2 MB) WP7 Results Deliverable D7.1 "Neutron Detector requirements" (219KB) Deliverable D7.3 "CREMAPS sensor design" (1013KB) WP9 Results Deliverable D9.2 "Training needs of Russian RIs staff" (2.7 MB)